-
Tall Buildings in London Part 1 – Telecomms Policy
-Overview The latest London policy on tall buildings within the ‘London Plan 2021’ was released earlier in March. With guidance…
00 -
Exploring Instrument Flight Procedures (IFPs)
-What is an Instrument Flight Procedure? An Instrument Flight Procedure (IFP) is a set of instructions regarding navigation around aerodromes.…
-
Planning Issues for Buildings – TV and Radio Interference
-Television and radio services Television and radio services are broadcast in various ways. Among them are wireless broadcasts from terrestrial…
-
London’s Greenest Building
-Background Fuel and Power for commercial buildings accounts for 6.3% of worldwide greenhouse gas emissions. We examined the world’s greenest…
-
Cross Laminated Timber
-Background The construction industry currently accounts for 45% of carbon emissions and 50% of total landfill in the UK. The…
-
Cranes and Aviation Risk
-Background Cranes can present a physical obstruction risk to low flying aircraft. This risk is managed by airport safeguarding teams…
-
Tall Buildings and Microwave Links
-Background Point to point microwave links are a core element of telecommunications infrastructure. They carry digital data at the speed…