Raytheon Wind Farm Mitigation upgrade to extend to additional Netherlands air bases - Pager Power
+44 1787 319001

Raytheon Wind Farm Mitigation upgrade to extend to additional Netherlands air bases

Raytheon Wind Farm Mitigation upgrade to extend to additional Netherlands air bases
May 28, 2013 Amy Sudbury

Contracted by the Royal Netherlands Air Force (RNAF), Raytheon will provide a wind farm mitigation upgrade to the radar system at four Netherlands air bases.

The contract comes after the technology company successfully implemented the first upgrade to the primary surveillance radar (PSR) at the RNAF Woensdrecht air base, back in 2012. This initial employment means that a nearby existing wind farm can be expanded, without compromising flight activity at the base.

The application of the mitigation technology will reduce the presence of the wind farm on the radar screen, whilst improving the probability of detecting an aircraft target. Due to be completed within 12 – 15 months, Raytheon state that upgrade execution will include WiMax interference filtering (4G Filtration), alongside changes to PSR hardware and software.

Pager Power and Wind Farm Radar Mitigation

If you have a project and would like some guidance on which mitigation method is most suited, we can conduct a mitigation study on your behalf. Results will inform you of which are available, and conclude with our recommendation. Speak to a member of our technical consultancy team about your site by calling +44 (0) 1787 319001 or emailing info@pagerpower.com.

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*

Make an Enquiry

You can make an enquiry here

    Your Name (required)Your Email (required)Subject Your Message