Pager Power is also able to offer developers an in-house assessment of MOD issues for a proposed wind development. With a good understanding of MOD concerns, our analysts are able to give an overview of the situation in order to assess the likelihood of the MOD objecting to the proposed site. This can be delivered to the client within 2 weeks, saving valuable time compared with going directly to the MOD.
It should be noted that the MOD requires to be consulted if a proposed wind turbine is 11 metres to blade tip or taller, and has a rotor diameter of 2 metres or more.