London Stadium Solar Panels Achieve the 1 Million kWh Milestone

Last Updated: November 16, 2026
Share:
After their installation in July 2025, the solar panels atop the roof of the London Stadium have surpassed the milestone of generating 1 million kWh of energy.
Switched On
The solar installation was switched on and operational as of July 2025, ahead of the Novuna London Athletics Meet. The installation measures 6,500m2 of solar panels integrated into the stadium’s roof. It is one of the largest solar installations atop a stadium across Europe [1].
Powering On
16 months on from its installation, the solar panels have generated 1 million kWh of energy, equivalent to the annual power demand of more than 350 family homes while cutting 177 tonnes of carbon emissions. Over 140,000 kWh of energy was produced in June 2026, equivalent to 21% of the venues’ energy demands for that month [2].
The importance of this incredible milestone was recognised by Sacha Giovannoni, Sustainability Manager at London Stadium, who said “It is extremely exciting to be one of the venues leading the way in sustainable venue management, achieving remarkable environmental milestones through innovative technology and strategic partnerships.” [3]
Stadiums and Solar
The London Stadium is one of many that implement a rooftop solar scheme to generate clean energy. More recently, the Principality Stadium in Cardiff installed the largest solar scheme for a stadium roof in the UK. The scheme generates approximately 1.2 million kWh of renewable electricity annually [4].
In September 2025, Oxford United were granted planning permission to proceed with plans that will result in their home ground becoming the first football stadium run entirely on renewable energy. You can read our article covering this here.
About Pager Power
Pager Power is a dedicated technical consultancy that has been providing independent guidance and advice regarding solar, wind, and building developments internationally since 2002.
Pager Power has completed over 1,900 glint and glare assessments, over 1,000 aviation, radar and safeguarding assessments, and over 1,000 telecommunications assessments, including the assessment of point-to-point link infrastructure, and television, mobile phone, and radio reception surveys. Pager Power is a truly international technical planning consultancy, having worked in over 60 countries.
To discuss a project, contact our team on +44 (0) 1787 319001 or visit our website.
References
[1] https://www.london-stadium.com/news/2025/july/london-stadium-powers-up.html
[3] https://energydigital.com/news/1-million-kwh-amerescos-london-stadium-solar-milestone
[4] https://evoenergy.co.uk/case-study/principality-stadium/
Image accreditation: John-Mark Strange (May 2025) from Unsplash.com. Last accessed on 16th November 2026. Available at: https://unsplash.com/photos/londons-olympic-park-with-a-ferris-wheel-and-stadium-LaoJt7UMqIk





