Glint and Glare Survey and Detailed Screening Analysis

Strengthen planning applications with site survey and screening analysis that proves reflection visibility, reduces uncertainties, and refines mitigation for solar and building projects.

Surveys: On-Site Validation of Line-of-Sight

Why Survey Matters
Field surveys validate which receptors have true line-of-sight, reducing false positives and building trust in your assessment.

What the Survey Provides
Our survey team visits key receptor locations (residences, roads, aviation positions, rail) to record ground conditions, elevations, existing screening (vegetation, buildings) and sightlines toward reflecting surfaces. We photograph and annotate visible aspects relevant to reflection modelling.

Screening Analysis: Refining the Model

Why Screening Analysis Matters
Even if survey confirms potential visibility, detailed screening determines which panels or façades actually reflect toward receptors after considering terrain, buildings, and proposed landscaping. This refines mitigation scope.

What the Screening Provides
We integrate survey data into line-of-sight modelling to filter out panels not actually visible. Outputs include refined receptor lists, visibility maps showing only those elements within sightlines, and exclusion of false-positive reflections.

Mitigation Informed by Screening

Based on survey and screening outputs, typical mitigation may include:

  • Targeted boundary planting or bunds to block direct sightlines
  • Removal or repositioning of reflective elements only where visibility is confirmed
  • Adjustments to panel orientation or glazing angles
  • Integration of proposed development landscaping into screening models

Related Services

Fast proposals within 48hrs
5 Working Day Delivery Options
Authors of Industry leading guidance

We have always found it very easy to work with Pager Power

Pager Power undertake Radar and Aviation assessments for our wind turbine developments – particularly civil and MoD radar issues. We have always found it very easy to work with Pager Power, they always deliver what they say they will deliver on time. The assessments and advice are always spot on and have allowed us to progress projects with confidence, knowing that we will be able to deal with potential technical challenges should they arise. We have learned to trust and respect their advice and they are our go-to consultants for this type of work.


Guy Hopwood
Principal Environmental Consultant, ADAS

Pager Power has helped us obtain planning permission across the UK

We first appointed Pager Power in 2004 to assess a number of wind farms in North East England resulting in objections being withdrawn by Newcastle Airport. The company has successfully helped us resolve NATS, Royal Airforce, telecommunications and minor airfield issues. Pager Power provides advice and technical analysis, are easy to talk to and deliver reports on time. Pager Power has helped us obtain planning permission across the UK including a range of onshore wind farms in North East England and Central Scotland.


Tony Scorer
Head of Onshore Wind Development, EDF Energy

Glint and Glare Guidance

Free Guidance:

Understand the basics of Glint And Glare and the methodology behind the assessment

Download the industry standard assessment methodology, defined from over 10 years’ experience and more than 1,500 assessments. The guide covers the process for assessing roads, dwellings, rail and aviation activity.

Sign up for our industry newsletter and receive the 4th edition of our Glint and Glare guidance today. Just fill out the form below and we’ll send it to you directly.