Glint and Glare Assessment for Building Developments

Our industry leading Glint and Glare Guidance and bespoke modelling software inform every assessment to ensure that your developments are both safe and community-friendly.

Solar glint and glare (i.e. reflected sunlight from shiny surfaces) can affect safety in surrounding areas. The most common safety concerns pertain to drivers on surrounding roads, railway lines, air traffic controllers and pilots approaching nearby airports. In addition, reflections towards dwellings can affect residential amenity.

Failure to address these issues can result in refusal of permission to develop a project and/or increase local opposition to the development.

What Our Assessment Provides

Glazing, glass façades, and rooftop solar panels can reflect sunlight toward sensitive receptors. These reflections – known as glint and glare – may cause discomfort for neighbours, distraction for drivers, or risks to aviation operations.

For new buildings, particularly in urban areas or close to airports and major transport routes, glint and glare assessment is often a requirement for planning consent. Addressing the issue with clear evidence avoids disputes, redesign costs, or refusal.

An assessment demonstrates whether your building design will create unacceptable reflection impacts, and where necessary, identifies solutions to reduce risks.

Aviation Receptors

Airports need to be confident that façades or rooftop panels will not distract pilots or air traffic controllers. Assessment therefore look at:

  • Air traffic control (ATC) personnel
  • Pilots on final approach
  • Other pilots in the area, such as those flying circuits, taxiing, or operating helicopters

We check whether solar reflections could be seen, how bright they might be, and where they would appear from the observer’s point of view.

Roads and Dwellings

Road safety and residential amenity are important considerations. Key receptors are:

  • Drivers on regional or national roads within 1 km
  • Homes within 1 km of the development
  • Public footpaths and other places where people may be affected

For drivers, we assess whether solar reflections could be distracting. For residents, we also consider how long any glare might last, since people at home are usually in fixed positions.

Railway Operators

Railway safety assessments focus on:

  • Train drivers on lines next to proposed solar panels
  • Railway signals near proposed panels

Impacts are determined by whether reflections are predicted and their position relative to the observer.

How We Support Your Project

With over 1,600 glint and glare assessments completed worldwide, Pager Power brings extensive experience to every project. Our reports provide comprehensive analysis of all relevant receptors, including aviation, transport, and neighbouring properties. We use our own industry-leading guidance, aligned with current best practice, to ensure each assessment is technically robust and planning-compliant.

Most importantly, our reports are written with clarity in mind — presenting modelling results alongside clear explanations and visuals. This makes outcomes and recommendations accessible to planners, consultees, and other stakeholders, helping your project progress smoothly.

Related Services

Fast proposals within 48hrs
5 Working Day Delivery Options
Authors of Industry leading guidance

We have always found it very easy to work with Pager Power

Pager Power undertake Radar and Aviation assessments for our wind turbine developments – particularly civil and MoD radar issues. We have always found it very easy to work with Pager Power, they always deliver what they say they will deliver on time. The assessments and advice are always spot on and have allowed us to progress projects with confidence, knowing that we will be able to deal with potential technical challenges should they arise. We have learned to trust and respect their advice and they are our go-to consultants for this type of work.


Guy Hopwood
Principal Environmental Consultant, ADAS

Pager Power has helped us obtain planning permission across the UK

We first appointed Pager Power in 2004 to assess a number of wind farms in North East England resulting in objections being withdrawn by Newcastle Airport. The company has successfully helped us resolve NATS, Royal Airforce, telecommunications and minor airfield issues. Pager Power provides advice and technical analysis, are easy to talk to and deliver reports on time. Pager Power has helped us obtain planning permission across the UK including a range of onshore wind farms in North East England and Central Scotland.


Tony Scorer
Head of Onshore Wind Development, EDF Energy

Glint and Glare Guidance

Free Guidance:

Understand the basics of Glint And Glare and the methodology behind the assessment

Download the industry standard assessment methodology, defined from over 10 years’ experience and more than 1,500 assessments. The guide covers the process for assessing roads, dwellings, rail and aviation activity.

Sign up for our industry newsletter and receive the 4th edition of our Glint and Glare guidance today. Just fill out the form below and we’ll send it to you directly.